1998: THE BEGINNING OF BIM



"PRE-construction model" future testing with digital twin.



First, SDRC I-DEAS parametrically tested the structure and enclosure of GENSLER design. Then, Pro /Engineer became the only 3d software able to handle this Very Large Assembly.